TeamLens for Confluence Workload report in a Confluence page: open, blocked and overdue work per Atlassian Team

Tiles: teams, open issues, blocked, overdue, open story points (when a story points field exists).

Chart: To do, In progress and Done (30 days) stacked per team; set Chart metric to Story points to chart open and done points instead.

ColumnMeaning
TeamAtlassian Team. Issues with no team are grouped in a (no team) row at the bottom.
To do / In progress / Done (30d)Issue counts by status category.
BlockedOpen issues flagged in Jira, or in a status whose name contains "block".
OverdueOpen issues whose due date has passed.